Vident Partners provides vetted cement and concrete expert witnesses for cases involving structural cracking, failed slabs, mix design, formwork and shoring collapse, durability and concrete strength disputes. Request a referral today.
Find a Cement & Concrete Expert →Overview
A cement and concrete expert decides why concrete cracked, failed or fell short of what was promised: whether the cause was the mix, the placing and curing, the design, or the conditions it later met. Concrete hides its history, so the work combines site inspection, core samples and lab testing with the batch and pour records. This page covers concrete materials and construction practice. Overall building design belongs to a structural engineer, the soil beneath it to a geotechnical engineer, and project delay and cost to a construction claims expert.
The expert reads mix designs, batch tickets, cylinder break reports, pour logs, weather records, rebar shop drawings, inspection reports and photographs, and then takes cores if the case calls for it. Batch tickets show what the plant reports it delivered. Water added at the site may not show up anywhere, and that is a recurring source of dispute.
A low cylinder test leads to arguments over whether the concrete or the test was wrong. Cylinders made and cured poorly on site can understate strength, and cores taken from the structure answer a slightly different question. The expert has to explain which measure the contract and code rely on, and what a low result means for safety and for value.
The largest recent investigation shows that strength numbers can mislead in both directions. In the collapse of Champlain Towers South, NIST reported that after extracting more than 300 concrete cores and rebar samples, the average tested concrete strength for structural elements such as slabs and columns exceeded the specified design strength, at that stage of testing 1. Poor material strength was therefore not the simple answer. The team's later findings concluded that the collapse began in early June 2021, when two connections between garage columns and the pool deck failed, in a type of failure called punching shear 2. Those initial failures caused cracks to grow and loads to redistribute over the next three weeks 2. An investigator said that margins against failure were too narrow from the start 2. The team also ran physical tests in which a slab and beam break away from a column, simulating the collapse of the pool deck 3.
The lesson for a civil case is that a good lab result does not end the analysis. The expert has to examine how the slab, rebar placement and loads worked together, usually with a structural engineer.
Some cracking is normal. The question is whether a crack is cosmetic, structural or a path for water. The expert reads width, pattern and location, and whether movement continues. Shrinkage cracks, settlement cracks and cracks from overload look different. Durability problems include corrosion of steel, freeze-thaw damage and chemical attack. In parking structures and coastal buildings, water and salt are usually the main causes, and maintenance records become central. Those cases often raise whether an owner or association delayed repairs.
Concrete under construction can kill. OSHA requires that formwork be designed, fabricated, erected, supported, braced and maintained so that it can support without failure all vertical and lateral loads that may reasonably be anticipated 4. Shoring equipment must be inspected before erection to confirm it meets the formwork drawings 4. Drawings and plans must be available at the jobsite 4. After a collapse, the expert asks whether forms were stripped too early, how strength was checked, who designed the shoring and who decided it could come out.
Cutting and grinding concrete carries a health hazard. OSHA's silica standard covers all occupational exposures to respirable crystalline silica in construction, with an exception where exposure will remain below 25 micrograms per cubic meter as an 8-hour average 5. Claims can involve dry cutting, the controls used and medical surveillance.
Look for a civil or materials engineer with direct experience in concrete testing and construction, ideally with petrographic or laboratory access. A petrographer reads thin sections of concrete and can address mix, water and damage mechanisms. ACI certifications show field or lab training. For a slab or foundation claim, a contractor with long placing experience may be the better witness on workmanship. Pair this expert with a structural engineer on load and design questions.
In the Champlain Towers South investigation, NIST reported that average tested concrete strength for slabs and columns exceeded the specified design strength.
Case Types
Low strength concrete and rejected pours
Slab, foundation and driveway cracking
Parking structure and balcony deterioration
Formwork and shoring collapse
Corrosion of reinforcing steel
Disputes between ready-mix suppliers and contractors
Silica exposure from cutting and grinding
Condominium repair and maintenance disputes
Qualifications
Related Specialties
FAQ
Look for a civil or materials engineer with direct concrete testing and construction experience, ideally with laboratory access. A petrographer can read damage mechanisms, and a long-time contractor may be the better witness on workmanship.
Not necessarily. Poorly made or cured cylinders can understate strength, and cores answer a slightly different question. The expert explains which measure the contract and code rely on.
No. Some cracking is normal. The expert reads width, pattern, location and movement to tell cosmetic cracks from structural ones or paths for water.
Its technical findings concluded the collapse began in early June 2021, when two connections between garage columns and the pool deck failed, with loads redistributing over the next three weeks.
It must be designed, built, braced and maintained to support all vertical and lateral loads that may reasonably be anticipated. Shoring must be inspected before erection, and drawings must be at the jobsite.
In general, cement and concrete expert fees are determined by the expert themselves, based on a variety of criteria. Among those criteria are experience, core sampling and lab needs, site access, the size of the structure and the amount of testimony. Vident does have some influence over expert fees by comparing experts within a specialty, but ultimately it is a personal decision by the expert.
Related Insights
A forensic engineer is a professional who applies engineering principles and expertise to investigate and analyze a wide variety of incidents, accidents and failures. The goal of forensic engineering...
Research BriefingOur previous post concerned a knee replacement products liability lawsuit against DePuy. However, a recent review indicates that active cases against DePuy are rare at this time. The landscape of...
Case AnalysisToday’s case is Bayes v. Biomet, https://ecf.ca8.uscourts.gov/opndir/22/12/212964P.pdf (8th Cir., No. 21-2964, 9/21/2022), a lawsuit against the manufacturer of a failed metal-on-metal hip...
Sources
Vident Partners connects attorneys with qualified cement & concrete expert witnesses. Complimentary consultation, 24-hour turnaround, no obligation.
Request an Expert →